A.G. Kagiannas, K.D. Patlitzianas, K. Metaxiotis, D.Th. Askounis, and J. Psarras
[1] D. Helm, Energy policy: Security of supply, sustainability andcompetition, Energy Policy, 30(3), 2002, 173–184. doi:10.1016/S0301-4215(01)00141-0 [2] D. Anderson, Models for determining least-cost investments inelectricity supply, Bell Journal of Economics and ManagementScience, 3, 1972, 267–285. doi:10.2307/3003078 [3] J.P. Huang, Decision analysis in energy and environmentalmodeling, Energy, 20(9), 1995, 843–855. doi:10.1016/0360-5442(95)00036-G [4] B.F. Hobbs, Optimisation methods for electric utility resourceplanning, European Journal of Operational Research, 83(1),1995, 1–20. doi:10.1016/0377-2217(94)00190-N [5] J.A. Bloom, Long-range generation planning using decomposition and probabilistic simulation, IEEE Trans. on PowerApparatus and Systems, 101(4), 1982, 797–802. doi:10.1109/TPAS.1982.317144 [6] P. Masse & R. Gilbrat, Application of linear programmingto investments in the electric power industry, ManagementScience, 3(2), 1957, 149–166. [7] Y.M. Park, K.Y. Lee, & L.T.O. Youn, New analytical approachfor long-term generation expansion planning based maximumprinciple and Gaussian distribution function, IEEE Trans. onPower Apparatus and Systems, 104(2), 1985, 390–397. doi:10.1109/TPAS.1985.319054 [8] N. Levin & J. Zahavi, Optimal mix algorithm with existingunits, IEEE Trans. on Power Apparatus and Systems, 103(5),1984, 954–962. doi:10.1109/TPAS.1984.318698 [9] A. Ramos, I.J. Peres-Arriaga, & J. Bogas, A nonlinear programming approach to optimal static generation expansionplanning, IEEE Trans. on Power Systems, 4(3), 1989, 1140–1146. doi:10.1109/59.32610 [10] Y. Fukuyama & H. Chiang, A parallel genetic algorithmfor generation expansion planning, IEEE Trans. on PowerSystems, 11(2), 1996, 955–961. doi:10.1109/59.496180 [11] Y.M. Park, J.B. Park, & J.R. Won, A hybrid genetic algorithm/dynamic programming approach to optimal long-termgeneration expansion planning, Electrical Power & EnergySystems, 20(4), 1998, 295–303. doi:10.1016/S0142-0615(97)00070-7 [12] D. Mills, L. Vlacic, & I. Lowe, Improving electricity planning:Use of a multicriteria decision making model, InternationalTransactions in Operational Research, 3(3/4), 1996, 293–304. [13] N.I. Voropai & E.Y. Ivanova, Multi-criteria decision analysistechniques in electric power system expansion planning, International Journal of Electrical Power and Energy Systems,24(1), 1999, 71–78. doi:10.1016/S0142-0615(01)00005-9 [14] A.G. Martins, D. Coelho, C.H. Antunes, & J. Climaco, Amultiple objective linear programming approach to powergeneration planning with demand-side management (DSM),International Transactions in Operational Research, 3(3/4),1996, 305–317. doi:10.1111/j.1475-3995.1996.tb00055.x [15] G. Mavrotas, D. Diakoulaki, & L. Papayannakis, An energyplanning approach based on mixed 0–1 multiple objectivelinear programming, International Transactions in OperationalResearch, 6(2), 1999, 231–244. doi:10.1111/j.1475-3995.1999.tb00153.x [16] S.T. Jenkins & D.S. Joy, Wien Automatic System PlanningPackage (WASP): An electric utility optimal generation expansion planning computer code, Oak Ridge National Laboratory,Oak Ridge, TN, 1974, ORNL 4945. [17] W.D. Dapkus & T.R. Bowe, Planning for new electric generation technologies: A stochastic dynamic programming approach, IEEE Trans. on Power Apparatus and Systems, 103(6),1984, 1447–1453. doi:10.1109/TPAS.1984.318482 [18] A.K. David & R. Zhao, Integrating expert systems withdynamic programming in generation expansion planning, IEEETrans. on Power Systems, 4(3), 1989, 1095–1101. doi:10.1109/59.32604 [19] H.T. Yang & S.L. Chen, Incorporating a multi-criteriadecision procedure into the combined dynamic programming/production simulation algorithm for generation expansion planning, IEEE Trans. on Power Systems, 4(1), 1989,165–175. doi:10.1109/59.32474 [20] A.K. David & R. Zhao, An expert system with fuzzy sets foroptimal planning, IEEE Trans. on Power Systems, 6(1), 1991,59–65. doi:10.1109/59.131092 [21] J.L. Baken & N. Lucas, Integrated resource planning and environmental pricing in a competitive and deregulated electricitymarket, Energy Policy, 24(3), 1996, 239–244. doi:10.1016/0301-4215(95)00132-8 [22] A.S. Malik & B.J. Cory, Integrated resource planning withconsideration of dynamic costs of thermal units, Electric PowerSystems Research, 51(2), 1999, 123–130. doi:10.1016/S0378-7796(98)00143-6 [23] J.N. Swisher & R.Y. Redlinger, Tools and methods for integratedresource planning: Improving energy efficiency and protecting266the environment, United Nations Environment Programme—Riso National Laboratory, Roskilde—Denmark, 1997. [24] E.L. Vine, International DSM and DSM program evaluation:An indepth assessment, Energy, 21(10), 1996, 983–996. doi:10.1016/0360-5442(96)00028-X [25] B.S. Reddy & J.K. Parikh, Economic and environmentalimpacts of demand side management programmes, EnergyPolicy, 25(3), 1997, 349–356. doi:10.1016/S0301-4215(96)00134-6 [26] P. Papastamatiou & J. Psarras, Market modelling for assessment of demand side programs using the marginal cost, International Journal of Energy Research, 24(10), 2000, 887–900. doi:10.1002/1099-114X(200008)24:10<887::AID-ER631>3.0.CO;2-2 [27] A.S. Malik, Modelling and economic analysis of DSM programsin generation planning, International Journal of ElectricalPower and Energy Systems, 23(5), 2001, 413–419. doi:10.1016/S0142-0615(00)00077-6 [28] I. Dyner & E.R. Larsen, From planning to strategy in theelectricity industry, Energy Policy, 29(13), 2001, 1145–1154. doi:10.1016/S0301-4215(01)00040-4 [29] A. Ramos, M. Ventosa, & M. Rivier, Modeling competitionin electric energy markets by equilibrium constraints, UtilitiesPolicy, 7(4), 1998, 233–242. doi:10.1016/S0957-1787(98)00016-2 [30] C.J. Day, B.F. Hobbs, & J.S. Pang, Oligopolistic competitionin power networks: A conjectured supply function approach,University of California Energy Institute, POWER, PWP-090,2002. [31] W.W. Hogan, A market power model with strategic interactionin electricity networks, The Energy Journal, 18(4), 1997, 107–141. [32] R. Pandey, Energy policy modelling: Agenda for developingcountries, Energy Policy, 30(2), 2002, 97–106. doi:10.1016/S0301-4215(01)00062-3 [33] D. Johnson, The Euro-Mediterranean energy partnership, Financial Times, Energy, 2000 [34] European Commission, External Relations Directorate-General, The Euro-Mediterranean partnership: Barcelona Declaration, 1995, http://www.europa.eu.int/comm/external_relations/euromed/bd.htm. [35] A.F.A. Khella, Egypt: Energy planning policies with environmental considerations, Energy Policy, 25(1), 1997, 105–115. doi:10.1016/S0301-4215(96)00100-0 [36] M. Beenstock, E. Goldin, & Dan Nabot, The demand forelectricity in Israel, Energy Economics, 21, 1999, 168–183. doi:10.1016/S0140-9883(98)00005-X [37] J.O. Jaber, M.S. Mohsen, S.D. Probert, & M. Alees, Futureelectricity-demands and greenhouse-gas emissions in Jordan,Applied Energy, 69(1), 2001, 1–18. doi:10.1016/S0306-2619(00)00068-4 [38] S. Saab, E. Badr, & G. Nasr, Univariate modeling and forecasting of energy consumption: The case of electricity in Lebanon,Energy, 26, 2001, 1–14. doi:10.1016/S0360-5442(00)00049-9 [39] V.S. Ediger & H. Tathdil, Forecasting the primary energydemand in Turkey and analysis of cyclic patterns, EnergyConversion and Management, 43, 2002, 473–487. doi:10.1016/S0196-8904(01)00033-4 [40] Energy Information Administration (EIA), Annual energy outlook 2003 with projections to 2025, Energy Information Administration, Office of Integrated Analysis and Forecasting,U.S. Department of Energy, Washington, DC, 2003. [41] European Commission, Directorate General for Energy (DG-XVII), European Union energy outlook to 2020, special issueof Energy in Europe, 1999. [42] P. Capros, L. Paroussos, & N. Stroblos, Energy saving investment and employment: Analysis through the GEM-E3 model,National Technical University of Athens, 1999. [43] International Atomic Energy Agency, Annual report for 2001,Vienna—Austria, 2002. [44] International Energy Agency, Electricity Information, Part II,Paris—France, 2001. [45] A.G. Kagiannas, Th. Didis, D.Th. Askounis, & J.E. Psarras,Strategic appraisal of energy models for Mozambique, International Journal of Energy Research, 27(2), 2003, 173–186. doi:10.1002/er.866 [46] European Commission, Euro-Mediterranean Energy ForumSecretariat, Mediterranean energy policy document, Brussels—Belgium, 1998. [47] J. Fülöp, J. Hoffer, & P. Dörfner, LDC module: A load databased tool in electricity planning, International Journal ofElectrical Power & Energy Systems, 14(6), 1992, 370–374. doi:10.1016/0142-0615(92)90020-A [48] C. Christov, K. Simeonova, S. Todorova, & V. Krastev, Assessment of mitigation options for the energy system in Bulgaria,Applied Energy, 56(3–4), 1997, 299–308. doi:10.1016/S0306-2619(97)00012-3 [49] S. Molnár, Assessment of mitigation measures and programsin Hungary, Applied Energy, 56(3–4), 1997, 325–339. doi:10.1016/S0306-2619(97)00014-7 [50] S. Rosekrans, D. Kirshner, & C. Marnay, Issues in electricityplanning with computer models: Illustrations with Elfin andWASP, Utilities Policy, 7(4), 1999, 201–219. doi:10.1016/S0957-1787(99)00002-8 [51] E.M. Oblow, Evaluation of the mathematical and economicbasis for conversion processes in the LEAP energy-economymodel, Applied Mathematical Modelling, 7(6), 1983, 405–411. doi:10.1016/0307-904X(83)90145-2 [52] A. Kumar, S.C. Bhattacharya, & H.L. Pham, Greenhouse gasmitigation potential of biomass energy technologies in Vietnamusing the long range energy alternative planning system model,Energy, 28(7), 2003, 627–654. doi:10.1016/S0360-5442(02)00157-3 [53] C. Berger, R. Dubois, A. Haurie, E. Lessard, R. Loulou, & J.P.Waaub, Canadian MARKAL: An advanced linear programmingsystem for energy and environment modeling, INFOR, 30(3),1992, 222–239. [54] T. Kran & D. Hill, A multinational model for CO2 reduction:Defining boundaries of future CO2 emissions in nine countries,Energy Policy, 24(1), 1996, 39–51. doi:10.1016/0301-4215(95)00122-0 [55] A. Kanudia & R. Loulou, Robust responses to climate changevia stochastic MARKAL: The case of Québec, European Journal of Operational Research, 106(1), 1998, 15–30. doi:10.1016/S0377-2217(98)00356-7 [56] A. Kanudia & P.R. Shukla, Modelling of uncertainties andprice elastic demands in energy-environment planning for India,Omega, 26(3), 1998, 409–423. doi:10.1016/S0305-0483(97)00071-6 [57] M. Salvia, C. Cosmi, M. Macchiato, & L. Mangiamele, Wastemanagement system optimisation for Southern Italy withMARKAL model, Conservation and Recycling, 34(2), 2002,91–106. doi:10.1016/S0921-3449(01)00095-7 [58] National Technical University of Athens, European Commission Joule-III Programme, The PRIMES energy system model:Reference manual, http://www.e3mlab.ntua.gr/manuals/PRIMrefm.PDF. [59] S. Syri, M. Amann, P. Capros, L. Mantzos, J. Cofala, & Z.Klimont, Low-CO2 energy pathways and regional air pollutionin Europe, Energy Policy, 29(11), 2001, 871–884. doi:10.1016/S0301-4215(01)00022-2
Important Links:
Go Back