Create New Account
Login
Search or Buy Articles
Browse Journals
Browse Proceedings
Submit your Paper
Submission Information
Journal Review
Recommend to Your Library
Call for Papers
TIME-DELAY ESTIMATION IN CLOSED-LOOP PROCESSES USING AVERAGE MUTUAL INFORMATION THEORY
S. Bab ji and A.K. Tangirala
References
[1] N.J.I. Mars & G.W. van Aragon, Time delay estimation innon-linear systems using average amount of mutual informationanalysis, Signal Processing, 4, 1982, 139–153.
[2] G. Deuschl, R.B. Govindan, J. Raethjen, F. Kopper, & J.C.Claussen, Estimation of time-delay by coherence analysis,Physical A, 277 (350), 2005, 277–295.
[3] W.R. Ellingsen, Discussion of parameter estimation withclosed-loop operating data, Technometrics, 18 (4), 1976, 381–384.
[4] M. Jelali, An overview of control performance assessmenttechnology and industrail applications. Control EngineeringPractice, 14, 2005, 441–466.
[5] W.M. Wang, N.F. Thornhill, & B. Huang, Closed-loop identi-fication with a quantizer, Journal of Process Control, 15, 2005,729–740.
[6] L. Ljung, System Identification – Theory for the user (PrenticeHall, 1999).
[7] J.F. MacGregor & D.T. Fogal, Closed-loop identification: therole of the noise model and prefilters, Journal of ProcessControl, 5 (3), 1994, 163–171.
[8] P. Shi, Z. Lin, & Y. Shi, Robust output feedback control fordiscrete time-delay uncertain systems, Control and IntelligenceSystems, 34 (1), 2006, 57–63.181
[9] C.Y. Lu, J.S.H. Tsai, & T.J. Su, Delay dependent robust H∞filtering for interval systems with state delays, Control andIntelligence Systems, 34 (2), 2006, 113–118.
[10] D. Brillinger & A. Guha, Mutual information in the frequencydomain, Journal of Statistical Planning and Inference, 137 (3),2006, 1076–1084.
[11] T. Schreiber, Measuring information transfer, Physical ReviewLetters, 85 (2), 2000, 461–464.
[12] J. Mielniczuk & P. Wojdyo, Estimation of Hurst exponentrevisited, Computational Statistics & Data Analysis, 51, 2007,4510–4525.
[13] J. Moore, A. Grinsted, & S. Jevrejeva, Is there evidence forsunspot forcing of climate at multi-year and decadal periods?Geophysical Research Letters, 33, 2006, L17705–L17710.
[14] B.W. Bequette, Process control modeling, design, and simula-tion (Prentice Hall of India, 2005).
[15] http:www.mathworks.com/products/control/demos.html
[16] G.A. Miller, Problems and methods IIB H quastler, NeuralComputation, 7, 1995, 399–407.
[17] H.E. Hurst, R.P. Black, Y.M. Simaika, & E.H. Lloyd, Long-term storage: an experimental study, Journal of the RoyalStatistical Society. Series A (General), 129 (4), 1966, 591–593.
Important Links:
Abstract
DOI:
10.2316/Journal.201.2009.3.201-2085
From Journal
(201) Mechatronic Systems and Control (formerly Control and Intelligent Systems) - 2009
Go Back