Create New Account
Login
Search or Buy Articles
Browse Journals
Browse Proceedings
Submit your Paper
Submission Information
Journal Review
Recommend to Your Library
Call for Papers
INTEGRATING RENEWABLE ELECTRICITY PRODUCTION IN SOME EUROPEAN COUNTRIES INTO THE GRIDS
T.J. Hammons
References
[1] S. Kohler, Energiewirtschaftliche Planung f¨ur die Netzin-tegration von Windenergie-anlagen in Deutschland, VDE-Kongress 2004, ETG Fachtagung, Nachhaltige Energiever-sorgung, Berlin, October 2004, 18–20.
[2] U. Keussen, Folgen der Windenergieeinspeisung und Verteilungihrer Lasten, FGE Tagung 2003, Aachen, September 2003,11–12.
[3] Sassnick et al., Influence of increased wind energy infeed onthe transmission network, Paper C6-107, Proceedings CIGRE2004, CIGRE, Paris, 29 August–3 September 2004.
[4] REA generating plants connected to the high- and extra-highvoltage network, Guidelines (in addition to the grid codes) forrenewable-based generating plants’ connection to and paralleloperation on the high- and extra-high voltage network. VDN,August 2004.
[5] Eigenerzeugungsanlagen am Mittelspannungsnetz, VereinigungDeutscher Elektrizit¨atswerke – VDEW – e.v. (Hrsg.), 2. Aus-gabe. Frankfurt am Main: VWEW Energieverlag 1998. ISBN3-8022-0584-7.
[6] B. Buchholz et al., Advanced planning and operation of dis-persed generation ensuring power quality, security and effi-ciency in distribution systems. CIGRE 2004, Paris, 29 August–3September 2004.
[7] J. Scholtes & C. Schwaegerl, Energy Park KonWerl: Energymanagement of a decentralized supply system. Concept andfirst results. First International conference on the Integration ofRenewable Energy Sources and Distributed Energy Resources.Brussels, December 2004, 1–3.
[8] M. Bechberger & D. Reiche, Renewable energy policies in anenlarged European Union, RE in EU-28, Refocus Magazine,September/October 2003.
[9] European Renewable Energy Sources, Available on http://www.erec-renewables.org
[10] Regulatory Authority of Greece, Available on http://www.rae.gr
[11] Public Power Corporation, Available on http://www.dei.gr
[12] 3rd Operational program “Competitiveness , Available onhttp://www.antagonistikotita.gr
[13] T. Tsoutsos, I. Mavrogiannis, N. Karapanagiotis, S. Tselepis,& D. Agoris, An analysis of the Greek photovoltaic market,Renewable and Sustainable Energy Reviews, 8, 2004, 49–72.
[14] Centre for Reneable Energy Sources, Available on http://www.cres.gr
[15] J. Stefanakis, CRETE: An ideal case study for increased windpower penetration in medium sized autonomous power systems,IEEE Winter Meeting, PPC, Greece, 1999.
[16] Greek Association of RES Electricity Producers, Available onhttp://www.hellasres.gr
[17] A. Tsikalakis, I. Tassiou, & N. Hatziargyriou, Impact of EnergyStorage in the Secure and Economic Operation of Small Islands,MedPower04, Larnaca, Cyprus, 15–17 November 2004.
[18] Crete System Annual Report PPC, 2001.
[19] N. Hatziargyriou, A.G. Tsikalakis, A. Dimeas, D. Georgiadis,A. Gigantidou, J. Stefanakis, & E. Thalassinakis, Security andeconomic impacts of high wind power penetration in islandsystems, 2004 CIGRE Session, Paris, August 2004.
[20] N. Hatziargyriou et al., MORE CARE overview, Proc. ofMedPower02, MED02/002 Athens, November 2002.
[21] G. Kariniotakis, D. Mayer, J.A. Halliday, A.G. Dutton, A.D.Irving, R.A. Brownsword, P.S. Dokopoulos, & M.C. Alexiadis,Load, wind and hydro power forecasting functions of the more-care EMS system, Proc. of MedPower02, MED02/003 Athens,November 2002.
[22] N.D. Hatziargyriou, I. Skotinos, A. Tsikalakis, & A. Dimeas,Economic evaluation of energy production systems with highwind power penetration, application to the Greek NationalInterconnected system, 2004 EWEA Conference, London.
[23] IEC 61400-21, Wind Turbine Generator Systems – Part 21:Measurement and Assessment of Power Quality Characteristicsof Grid Connected Wind Turbines, Edition 1 InternationalStandard, 2001.
[24] Eltra Requirements for wind farms connected to the trans-mission grid. Second Edition. Document No 74174 (2000).http://www.eltra.dk/media/1030_12368.pdf. In Danish.
[25] M.T. Palsson, T. Toftevaag, K. Uhlen, & J.O.G. Tande, Large-scale wind power integration and voltage stability limits inregional networks, 2002 IEEE-PES Summer Meeting, Proceed-ings. Paper sponsored by Power System Dynamic PerformanceCommittee, Session on Power System Stability Control usingPower Electronic Devices, 1–8.
[26] M.T. Palsson, T. Toftevaag, K. Uhlen, & J.O.G. Tande, Controlconcepts to enable increased wind power penetration, 2003IEEE-PES Summer Meeting, Proceedings. Panel Paper 00534sponsored by Power System Dynamic Performance Committee,Session on Wind Generation Modeling and Controls, 1–7.
[27] J.O.G. Tande & K. Uhlen, Cost analysis case study of gridintegration of larger wind farms, Wind Engineering, 28 (3),2004, 265–273.
[28] Decreto-Lei n◦. 313/2001, from December 10th. Di´ario daRep´ublica n◦. 284, p´ags. 8024–8031, In Portuguese. Availableon http://www.dr.incm.pt
[29] Real Decreto 436/2004, from 12 March, In Spanish. Availableon “Normativas em www.omel.sp.
[30] Condiciones T´ecnicas Aplicables a la Generation de RegimenEspecial no Gestionable, In Spanish. Red El´ectrica de Espa˜na,Enero, 2004.
[31] E.D. Castronuovo & J.A. Pe¸cas Lopes, On the optimizationof the daily operation of a wind–hydro power plant, IEEETransactions in Power Systems, 19 (3), 2004, 1599–1606.
[32] ESB National Grid, Minimum size for wind Farms version 1.7,Available on http://www.eirgrid.com
Important Links:
Abstract
DOI:
10.2316/Journal.203.2010.1.203-3957
From Journal
(203) International Journal of Power and Energy Systems - 2010
Go Back