Haoming Liu, Jianchao Wu, and Yunhe Hou
[1] M. Kitada, T. Masuya, and H. Tanaka, Experimental houseload operation at Tanagawa No.2 oil-fired power station, IEEETransactions on Power Apparatus and Systems, PAS-100(6),1981, 2796–2803. [2] F.P. De Mello and J.C. Westcott, Steam plant startup andcontrol in system restoration, IEEE Transactions on PowerSystems, 9(1), 1994, 93–101. [3] W. Huang, Research and study of FCB test based on con-ventional configuration. Proc. International Conf. on Elec-tronics, Communications and Control, Ningbo, China, 2011,4448–4450. [4] Jianhui Li, En Lu, Ning Wang, Chong Wang, Yunhe Hou,and Haoming Liu, Research on influences of fast cut backunits on post-separation control, The IASTED InternationalSymposium on Power and Energy, Marina del Rey, CA, 2013. [5] Yuhua Ma, Jialong Li, Fei Long, Chong Wang, Yunhe Hou,and Haoming Liu, Influences of leading phase operation ofFCB generating units on system restoration, The IASTEDInternational Symposium on Power and Energy, Marina delRey, CA, 2013. [6] W. Sun, C.C. Liu, and L. Zhang, Optimal generator start-upstrategy for bulk power system restoration, IEEE Transactionon Power Systems, 26(3), 2011, 1357–1366. [7] E. Lu, N. Wang, Z. Qin, Haoming Liu, and Yunhe Hou, Black-start strategy for power grids including fast cut thermal powerunits, Proc. IEEE Power & Energy Society General Meeting,Vancouver, BC, Canada, 2013. [8] P.S. Sensarma and M. Rahmani, A comprehensive method foroptimal expansion planning using particle swarm optimization,Proc. IEEE Power Engineering Society Transmission andDistribution Conf., New York, NY, 2002, 1317–1322. [9] J. Kennedy and R.C. Eberhart, Particle swarm optimization,Proc. IEEE International Conf. on Neural Networks, Perth,Australia, 1995, 1942–1948.
Important Links:
Go Back