RELIABILITY-BASED MULTI-ROBOT ROUTE PLANNING

Ugur Yayan and Ahmet Yazici

References

  1. [1] European Factories of the Future Research Association (EFFRA), Factories of the future: Multi annual roadmap for thecontractual PPP under horizon 2020 (Brussels: PublicationsOffice of the European Union, 2013), 1–40.
  2. [2] A. Yazici, A. Sipahioglu, O. Parlaktuna, and U. G¨urel,A heuristic-based route planning approach for a homogeneousmulti-robot team, Proceedings of the 2006 IEEE InternationalSymposium on Intelligent Control, Munich, Germany, 2006,1237–1242.
  3. [3] F. Bullo, E. Frazzoli, M. Pavone, K. Savla, and S.L. Smith,Dynamic vehicle routing for robotic systems, Proceedings ofthe IEEE, 99(9), 2011, 1482–1504.
  4. [4] A. Yazıcı, G. Kirlik, O. Parlaktuna, and A. Sipahioglu, Dynamic path planning approach for multi-robot sensor-basedcoverage considering energy constraints, IEEE Transactions onSystems, Man and Cybernetics-Part B, 44(3), 2014, 305–314.
  5. [5] B. Kaleci, and O. Parlaktuna, Market-based multi-robot taskallocation using energy-based bid calculations, InternationalJournal of Robotics and Automation, 27(4), 2012, 396.
  6. [6] A. Pandey, S. Pandey, and D.R. Parhi, Mobile robot navigationand obstacle avoidance techniques: A review, InternationalJournal of Robotics and Automation, 2(3), 2017, 1–12.
  7. [7] L. Gilbert, The vehicle routing problem: An overview of exactand approximate algorithms, European Journal of OperationalResearch, 59(3), 1992, 345–358.
  8. [8] U. Ritzinger, J. Puchinger, and R.F. Hartl, A survey ondynamic and stochastic vehicle routing problems, InternationalJournal of Production Research, 54(1), 2016, 215–231.
  9. [9] M. Ozkan, G. Kirlik, O. Parlaktuna, A. Yufka, and A. Yazici,A multi-robot control architecture for fault-tolerant sensor-based coverage, International Journal of Advanced RoboticSystems, 7(1), 2010, 67–74.
  10. [10] J. Carlson, and R.R. Murphy, Reliability analysis of mobilerobots, Proceedings of ICRA’03 IEEE International Conferenceon Robotics and Automation, The Grand Hotel, Taipei, Taiwan,1, 2003, 274–281.
  11. [11] J. Carlson, and R.R. Murphy, How UGVs physically fail in thefield, IEEE Transactions on Robotics, 21(3), 2005, 423–437.
  12. [12] S. Stancliff, J. Dolan, and A. Trebi-Ollennu, Planning to fail-reliability needs to be considered a priori in multirobot taskallocation, IEEE International Conference on Systems, Manand Cybernetics, SMC 2009, San Antonio, TX, USA, 2009,2362–2367.
  13. [13] A. Yazici, A. Sipahioglu, and O. Parlaktuna, Heuristic-baseddynamic route planning method for a homogeneous multi-robotteam, Advanced Robotics, 23(3), 2009, 269–287.
  14. [14] Y. Zhang and J. Jiang, Bibliographical review on reconfigurablefault-tolerant control systems, Annual Reviews in Control, 32,2008, 229–252.
  15. [15] B.S. Dhillon, Robot system reliability and safety: A modernapproach (USA: CRC Press, 2015).
  16. [16] Warwick Manufacturing Group, An Introduction to Reliabil-ity Engineering Section 7 (United Kingdom: University ofWarwick, 2007).
  17. [17] S. Stancliff, J. Dolan, and A. Trebi-Ollennu, Towards a predic-tive model of mobile robot reliability (Pittsburgh, PA: CarnegieMellon University, 2005).
  18. [18] G. Clarke and J. Wright, Scheduling of vehicles from a centraldepot to a number of delivery points, Operations Research,12(4), 1964, 568–581.
  19. [19] R.K. Ahuja, T.L. Magnanti, and J.B. Orlin, Network flows,theory algorithms, and applications (Englewood Cliffs, NJ:Prentice Hall, 1993).
  20. [20] O. Parlaktuna, A. Sipahio˘glu, and A. Yazici, A VRP-basedroute planning for a mobile robot group, Turkish Journalof Electrical Engineering & Computer Sciences, 15(2), 2007,187–197.
  21. [21] A. Sipahioglu, A. Yazici, O. Parlaktuna, and U. Gurel,Real-time tour construction for a mobile robot in a dynamicenvironment, Robotics and Autonomous Systems, 56(4), 2008,289–295.
  22. [22] A. Sipahioglu, G. Kirlik, O. Parlaktuna, and A. Yazici,Energy constrained multi-robot sensor-based coverage pathplanning using capacitated arc routing approach, Robotics andAutonomous Systems, 58(5), 2010, 529–538.

Important Links:

Go Back