Create New Account
Login
Search or Buy Articles
Browse Journals
Browse Proceedings
Submit your Paper
Submission Information
Journal Review
Recommend to Your Library
Call for Papers
ENUMERATIVE SEARCH ALGORITHM FOR ROBOTIC DISASSEMBLY LINE BALANCING PROBLEM, 35-43.
Ganesan Kanagaraj, Raju Naresh, and Vincent F. Yu
References
[1] Y. Fang, Q. Liu, M. Li, Y. Laili, and D.T. Pham, Evolutionarymany-objective optimization for mixed-model disassembly linebalancing with multi-robotic workstations, European Journalof Operational Research, 276(1), 2019, 160–174.
[2] J.L. Sager and M.R. Schmehl, U.S. Patent No. 5,040,056, U.S.Patent and Trademark Office, Washington, DC, 1991.
[3] J. Liu, Z. Zhou, D.T. Pham, W. Xu, C. Ji, and Q. Liu,Collaborative optimization of robotic disassembly sequenceplanning and robotic disassembly line balancing problem usingimproved discrete Bees algorithm in remanufacturing, Roboticsand Computer-Integrated Manufacturing, 61, 2020, 101829.
[4] A. Gungor, S.M. Gupta, K. Pochampally, and S.V. Kamarthi,Complications in disassembly line balancing, in Environmen-tally conscious manufacturing, Vol. 4193 (Bellingham, Wash-ington: International Society for Optics and Photonics, 2001),289–298.
[5] B. Basdere and G. Seliger, Disassembly factories for electricaland electronic products to recover resources in product andmaterial cycles, Environmental Science & Technology, 37(23),2003, 5354–5362.
[6] P. Gil, J. Pomares, S.V.P.C. Diaz, Candelas, and F. Tor-res, Flexible multi-sensorial system for automatic disassemblyusing cooperative robots, International Journal of ComputerIntegrated Manufacturing, 20(8), 2007, 757–772.
[7] J.R. Duflou, G. Seliger, S. Kara, Y. Umeda, A. Ometto, andB. Willems, Efficiency and feasibility of product disassembly:A case-based study, CIRP Annals, 57(2), 2008, 583–600.
[8] J. Li, M. Barwood, and S. Rahimifard, A multi-criteria assess-ment of robotic disassembly to support recycling and recovery,Resources, Conservation and Recycling, 140, 2019, 158–165.
[9] C.S. D´ıaz Baca, S.T. Puente M´endez, and F. Torres, Auto-matic cooperative disassembly robotic system, Proceedings ofthe Sixth IASTED International Conference on Robotics andApplications: October 31–November 2, 2005, Cambridge, MA,USA, 2005, 197–202. ISBN 0-88986-521-3.
[10] P. Yuan, M. Moallem, and R.V. Patel, A feedback schedulingframework for real-time robotic assembly systems, Interna-tional Journal of Robotics and Automation, 24(1), 2009, 10.
[11] P.P.A. Kumar, R. Maheswaran, and M.S.V. Raj, A modifiedparticle swarm optimization to improve precision of complexassembly, International Journal of Robotics and Automation,31(4), 2016. DOI: 10.2316/Journal.206.2016.4.206-4483.
[12] Y. Fang, H. Ming, M. Li, Q. Liu, and D.T. Pham, Multi-objective evolutionary simulated annealing optimisation formixed-model multi-robotic disassembly line balancing withinterval processing time, International Journal of ProductionResearch, 58(3), 2020, 846–862.
[13] E. ¨Ozceylan, C.B. Kalayci, A. G¨ung¨or, and S.M. Gupta,Disassembly line balancing problem: a review of the state of theart and future directions, International Journal of ProductionResearch, 57(15–16), 2019, 4805–4827.
[14] S.M. McGovern and S.M. Gupta, Combinatorial optimizationanalysis of the unary NP-complete disassembly line balanc-ing problem, International Journal of Production Research,45(18–19), 2007, 4485–4511.
[15] S. Mete, Z.A. Cil, K. Apak, E. ¨Ozceylan, and A. Dolgui,A solution approach based on beam search algorithm fordisassembly line balancing problem, Journal of ManufacturingSystems, 41, 2016, 188–200.
[16] A. ElSayed, E. Kongar, and S.M. Gupta, A genetic algorithmapproach to end-of-life disassembly sequencing for roboticdisassembly, Proc. of the Northeast Decision Sciences InstituteConf., NEDSI 2010, Alexandria, VA, USA, 2010, 26–28.
[17] M. Alshibli, A. El Sayed, E. Kongar, T.M. Sobh, and S.M.Gupta, Disassembly sequencing using tabu search. Journal ofIntelligent & Robotic Systems, 82(1), 2016, 69–79.
[18] J. Liu, Z. Zhou, D.T. Pham, W. Xu, J. Yan, A. Liu, andQ. Liu, An improved multi-objective discrete bee’s algorithmfor robotic disassembly line balancing problem in remanufac-turing, The International Journal of Advanced ManufacturingTechnology, 97(9–12), 2018, 3937–3962.
[19] Q. Lu, Y. Ren, H. Jin, L. Meng, L. Li, C. Zhang, and J.W.Sutherland, A hybrid metaheuristic algorithm for a profit-oriented and energy-efficient disassembly sequencing problem,Robotics and Computer-Integrated Manufacturing, 61, 2020,101828.
[20] Y. Tang, M. Zhou, E. Zussman, and R. Caudill, Disassemblymodeling, planning, and application, Journal of ManufacturingSystems, 21(3), 2002, 200.
[21] A. Yoosefelahi, M. Aminnayeri, H. Mosadegh, and H.D. Ar-dakani, Type II robotic assembly line balancing problem: Anevolution strategies algorithm for a multi-objective model,Journal of Manufacturing Systems, 31(2), 2012, 139–151.
[22] A. Koc, I. Sabuncuoglu, and E. Erel, Two exact formulationsfor disassembly line balancing problems with task precedencediagram construction using an AND/OR graph, IIE Transac-tions, 41(10), 2009, 866–881.
[23] G. Levitin, J. Rubinovitz, and B. Shnits, A genetic algo-rithm for robotic assembly line balancing, European Journalof Operational Research, 168(3), 2006, 811–825.
Important Links:
Abstract
DOI:
10.2316/J.2021.206-0427
From Journal
(206) International Journal of Robotics and Automation - 2021
Go Back